Construction thread... Show off your work!

What’s their time frame for completion?
They gotta turn it over in July. The thing is it's an arena and two Uber office towers are part of the same project. It is pretty fucking massive. They should hit the deadline though. We are doing the air barrier on the exterior, I think we are half way around the exterior. There is still a shiton of work out there
 
They gotta turn it over in July. The thing is it's an arena and two Uber office towers are part of the same project. It is pretty fucking massive. They should hit the deadline though. We are doing the air barrier on the exterior, I think we are half way around the exterior. There is still a shiton of work out there


Right on!! Hopefully construction stays steady
 
@kap73 damn dude those are some serious shifts! I worked 8 last Saturday, had to remove some Batts and replace with rigid board. Hard lids are in, nothing to stand on kind of a pain I'm the ass. Still plugging away on the office building the exterior is FGRC fiber glass reinforced concrete, we are glueing stick pins to it, the surface is rough and a pain in the ass to get the pins to stick. It is going to be a nightmare to insulate as well.View attachment 99135 View attachment 99136 View attachment 99137 View attachment 99138 View attachment 99139


haha yeh u gota love when they want u to wear hard hats but dont provide proper access to your work front

ur always busy bro, make a good provider for yourself and family :)
 
well i finally finished formwork in the extraction hood 586F6E11-4917-4E1F-B86E-2597FEAE02D2.jpeg 56C485EC-D56A-4388-B5DB-6C5A70654152.jpeg77FB7E12-FDD3-4A91-8F2E-86760A98247C.jpeg

also left a note for dayshift in over these cunts milking it (my writing skills suck i know lol i messed it up a bit) but its a cryptic threat at the end that i cant get in trouble for :)
5D878EC9-5404-42A3-9EB1-AEE1EF1AF1A2.jpeg 714E7F63-3158-40BF-9CB5-0934746E5A1D.jpeg

finished the last cast at 2am and they boss told me to pack up my tools and head to camp for a sleep, they got a hire car waiting for me so i can drive 4 hours to the next job and start tonight lol so here i go
6C449439-D502-437D-8442-B53F83EFDEEC.jpeg BED00931-6C88-40CF-A2CC-B5016DB92A80.jpeg
 
nice job bro, few columns to go up there or are they goin to be pedastols?

fresh slab still got that white curing look to it

Pedestals of some sort that’s going to be the pool deck. Still only about half way up with the iron on the main tower. Another tower still needs to be built. Big project so that should keep my company busy along with the raiders stadium out here
 
Pedestals of some sort that’s going to be the pool deck. Still only about half way up with the iron on the main tower. Another tower still needs to be built. Big project so that should keep my company busy along with the raiders stadium out here

always good when you can forecast work for +12months

keep them photos coming bro i
 
Anyone in this thread. I'm building a sun room and I just wanted to get some pointers on the foundation. I have a concrete patio in the back I planned on using as the base.

If anyone thinks they could assist shoot me a PM and I'll provide more details and pictures.

Thanks.
 
Back
Top