Blood Work Breakdown

BloodVoT

New Member
I had blood work done for my first time as a TRT patient, and am kind of ignorant on how to read and understand if my results are good or not. I know it gives a sliding scale, but not sure if my test level where it is at is normal or not for 200mg weekly of Test Cyp. I ended my cycle of Tren along side of it about a month prior to testing. Attached is my results, maybe someone can help me to understand if they are good or bad.
 

Attachments

How many days after your last injection, from the little I know you want to test about 6 days after injection to see how low your test is before your next injection. I just did test-e @ 200 6 days after last injection and my TT was in the 600's. Usually people's goal is to find the right dose where AI is not needed.
 
Your hematocrit is getting pretty high. Being that your test is from a pharmacy I'd say your test levels are about where they should be.
 
How many days after your last injection, from the little I know you want to test about 6 days after injection to see how low your test is before your next injection. I just did test-e @ 200 6 days after last injection and my TT was in the 600's. Usually people's goal is to find the right dose where AI is not needed.
This was actually taken a day after my injection for the week. Not sure if that factors in higher numbers than usual. They have me doing Test Cyp @ 200mg/weekly. My test read 962 and free test was 125.8. Not sure about the free test numbers if that is normal. Another question, does the free test turn to estrogen? If that is the case, should I lower my dose of test weekly to make less free test? Sorry for my ignorance.
 

Sponsors

Back
Top